{"id":1508,"date":"2016-11-04T16:38:08","date_gmt":"2016-11-04T15:38:08","guid":{"rendered":"http:\/\/www.pauldevroom.com\/?p=1508"},"modified":"2016-11-23T21:40:11","modified_gmt":"2016-11-23T20:40:11","slug":"holland-house-building-site","status":"publish","type":"post","link":"https:\/\/www.pauldevroom.com\/?p=1508","title":{"rendered":"It\u2019s freezing in Moscow"},"content":{"rendered":"<p>Moscow is covered in snow, but that doesn\u2019t slow down the pace of building in this freezing city. At the moment the construction of the two apartment towers \u2018Holland House\u201d is in full swing. The underground parking is already nearing completion and the apartment floors are added at incredible speed. Thanks to the prefab panel system, engineered by the clients own factory foe precast concrete. We can\u2019t wait to see the buildings with the bricks imported from Holland.<\/p>\n<p>More information about the project:\u00a0<a title=\"K12 Holland House\" href=\"http:\/\/www.pauldevroom.com\/?portfolio=k12-holland-house\">Portfolio Holland\u00a0House<\/a><\/p>\n<p><a href=\"http:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px.jpg\"><img loading=\"lazy\" class=\"alignleft size-full wp-image-1588\" src=\"http:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px.jpg\" alt=\"hollandhouse_construction-site_800px\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px.jpg 800w, https:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px-300x200.jpg 300w, https:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px-460x306.jpg 460w, https:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px-600x400.jpg 600w, https:\/\/www.pauldevroom.com\/wp-content\/uploads\/2016\/10\/HollandHouse_construction-site_800px-640x426.jpg 640w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Moscow is covered in snow, but that doesn\u2019t slow down the pace of building in this freezing city. At the moment the construction of the two apartment towers \u2018Holland House\u201d is in full swing. The underground parking is already nearing completion and the apartment floors are added at incredible speed. Thanks to the prefab panel [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1589,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1,33],"tags":[],"_links":{"self":[{"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/posts\/1508"}],"collection":[{"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1508"}],"version-history":[{"count":7,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/posts\/1508\/revisions"}],"predecessor-version":[{"id":1590,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/posts\/1508\/revisions\/1590"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=\/wp\/v2\/media\/1589"}],"wp:attachment":[{"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pauldevroom.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}